Delivering a high-specification office fit-out for Ricardo in Manchester.

The Brief
Ricardo – Commercial Office Fit-Out, Manchester.
Ricardo appointed 4Front to deliver a high-specification office fit-out within a newly built Manchester office building.
The project involved transforming a blank office floor into a complete, functional workspace ready for staff relocation. With a fixed completion date and a 10-week delivery programme, the works needed to be carefully planned, coordinated and completed without delay.
Key considerations included:
- A fixed programme driven by staff relocation requirements.
- Delivery within a live multi-storey office building.
- Restricted access, with materials needing to be moved via staircases.
- Coordination with other contractors working on separate floors.
- A high-quality finish across office, meeting, breakout and welfare spaces.








Project before / in-progress
What We Did
A complete office fit-out delivered across a live multi-storey building.
4Front were appointed following a competitive tender process and delivered the full office fit-out within the agreed programme.
The project required careful sequencing and site management due to access limitations within the building. With lift access unavailable for materials, additional labour and close project management were used to maintain progress while protecting health and safety standards.
Scope of work included:
- Construction of partitioned office spaces.
- Creation of larger office rooms with full-height windows and strong natural light.
- Meeting rooms and separate conference areas.
- Bespoke soundproofed phone booths, including design and installation.
- Kitchenette installation.
- Kitchen and breakout area.
- Café area.
- Electrical installation.
- Lighting installation throughout.
- Ceiling works.
- Carpet installation.
- Decoration and internal finishes.
Specialist M&E subcontractors supported the delivery, with the majority of works managed in-house by 4Front.







Project after
The Outcome
A modern, high-quality workspace completed within the 10-week programme.
The completed office provided Ricardo with a fully fitted, high-specification workspace ready for staff relocation.
The project was delivered on time and to the agreed scope, with the final finish meeting the client’s requirements. The addition of bespoke soundproofed phone booths added further functionality to the space, supporting private calls and focused working within the wider office environment.
The result is a polished commercial office environment that demonstrates 4Front’s ability to deliver time-sensitive fit-out projects in live, multi-contractor buildings while maintaining quality, programme control and safe working practices.